-
- Each system includes all components needed to satisfy given length and amperage draw for your specific application. For systems requiring higher amperage, greater number of conductors and/or longer run.
- Crimped splices
- 3/4 inch spacing between conductors
- 15 foot sections
-
- 8-bar is the most economical solution for electrifying cranes and monorails. For systems requiring higher amperage, greater number of conductors and/or longer run.
- 3 inch spacing between conductors
- 10 foot sections
- Conductor bar lengths can be field cut to length with hand saw
-
The following kits are based on a 3 foot loop depth.
All kits include: hangers, splices, one tow bar, one lead carrier, cable carriers, one end stop, one end clamp. (Select flat cable and bushing boxes.) Contact us for other options.
Cable Not Included.