Online Store
Product Categories
Filter by Brand:
- Budgit Hoist(8325)
- Cleveland Tramrail (79)
- CM (5047)
- Coffing Hoists (6273)
- Duct-O-Wire (1071)
- Gorbel(8958)
- Magnetek (1010)
- Munck (1657)
- Schneider (32)
- Yale (4709)
Filter by Type:
- Jib Cranes (5300)
- Gantry Cranes (371)
- Air Chain Hoists (269)
- Lever Hoists (229)
- Hand Chain Hoists (573)
- Integrated Trolley Hoists (270)
Gorbel® 2000 Pound (lb) Capacity Ceiling Mounted Monorails
Ceiling Mounted Monorail
**IF PRICE IS LISTED AS "QUOTE" PLEASE SELECT REQUEST A QUOTE & WE WILL PROVIDE PRICING WITHIN 24 HOURS**
Unit of Measure
Items |
/Asset/a7709.jpg GLM2000-11.5 Gorbel® 6 Feet (ft) Maximum Hanger Spacing (L1) and 11 Feet (ft) 6 Inch (in) Runway Length Steel Ceiling Mounted Monorail Price $2,219.20
|
/Asset/a7709.jpg GLMS2000-11.5 Gorbel® 20 Feet (ft) Maximum Hanger Spacing (L1) and 11 Feet (ft) 6 Inch (in) Runway Length Steel Ceiling Mounted Monorail Price $1,862.00
|
/Asset/a7709.jpg GLM2000-23 Gorbel® 6 Feet (ft) Maximum Hanger Spacing (L1) and 23 Feet (ft) Runway Length Steel Ceiling Mounted Monorail Price $2,996.30
|
/Asset/a7709.jpg GLMS2000-23 Gorbel® 20 Feet (ft) Maximum Hanger Spacing (L1) and 23 Feet (ft) Runway Length Steel Ceiling Mounted Monorail Price $2,620.10
|
/Asset/a7709.jpg GLMSL2000-28 Gorbel® 25 Feet (ft) Maximum Hanger Spacing (L1) and 28 Feet (ft) Runway Length Steel Ceiling Mounted Monorail Price $3,670.80
|
|||||
Manufacturer | N/A Gorbel® | |||||||||
Brand | N/A Gorbel® | |||||||||
Support Centers | N/A GLM | N/A GLMS | N/A GLM | N/A GLMS | N/A GLMSL | |||||
Capacity | N/A 2000 lb | |||||||||
Maximum Hanger Spacing (L1) | N/A 6 ft | N/A 20 ft | N/A 6 ft | N/A 20 ft | N/A 25 ft | |||||
Runway Length | N/A 11 ft 6 in | N/A 11 ft 6 in | N/A 23 ft | N/A 23 ft | N/A 28 ft | |||||
Material | N/A Steel | |||||||||
Weight | N/A 140 lb | N/A 234 lb | N/A 257 lb | N/A 425 lb | N/A 585 lb | |||||
Product Category | N/A Ceiling Mounted Monorail | |||||||||
Note for List Price | N/A | |||||||||
Price Includes |
N/A
Monorails, hoist trolley, end stops, festoon gliders (festoon trolleys are provided for monorail lengths > 63’), 4 conductor #14 flat cable, festoon clamp, festoon tow arms (where applicable), festoon stack-up section, splice assemblies, and standard hanger brackets with threaded rod and hardware (up to the total number of hangers specified in the Work Station Crane Dimensional Brochure). Sway bracing (by others) is required (not included in the above prices). Center line of splice joints must be within 8” of hanger center line. |
N/A
Monorails, hoist trolley, end stops, festoon gliders (festoon trolleys are provided for monorail lengths > 63’), 4 conductor #14 flat cable, festoon clamp, festoon tow arms (where applicable), festoon stack-up section, splice assemblies, and standard hanger brackets with threaded rod and hardware (up to the total number of hangers specified in the Work Station Crane Dimensional Brochure). Sway bracing (by others) is required (not included in the above prices). Center line of splice joints must be within 48" of hanger center line. |
N/A
Monorails, hoist trolley, end stops, festoon gliders (festoon trolleys are provided for monorail lengths > 63’), 4 conductor #14 flat cable, festoon clamp, festoon tow arms (where applicable), festoon stack-up section, splice assemblies, and standard hanger brackets with threaded rod and hardware (up to the total number of hangers specified in the Work Station Crane Dimensional Brochure). Sway bracing (by others) is required (not included in the above prices). Center line of splice joints must be within 8” of hanger center line. |
N/A
Monorails, hoist trolley, end stops, festoon gliders (festoon trolleys are provided for monorail lengths > 63’), 4 conductor #14 flat cable, festoon clamp, festoon tow arms (where applicable), festoon stack-up section, splice assemblies, and standard hanger brackets with threaded rod and hardware (up to the total number of hangers specified in the Work Station Crane Dimensional Brochure). Sway bracing (by others) is required (not included in the above prices). Center line of splice joints must be within 48" of hanger center line. |
N/A
Monorails, hoist trolley, end stops, festoon gliders (festoon trolleys are provided for monorail lengths > 63’), 4 conductor #14 flat cable, festoon clamp, festoon tow arms (where applicable), festoon stack-up section, splice assemblies, and standard hanger brackets with threaded rod and hardware (up to the total number of hangers specified in the Work Station Crane Dimensional Brochure). Sway bracing (by others) is required (not included in the above prices). Center line of splice joints must be within 48" of hanger center line. |
|||||
Product Hierarchy | N/A | |||||||||
|