Online Store
Product Categories
Filter by Brand:
- Budgit Hoist(8325)
- Cleveland Tramrail (79)
- CM (5047)
- Coffing Hoists (6273)
- Duct-O-Wire (1071)
- Gorbel(8958)
- Magnetek (1010)
- Munck (1657)
- Schneider (32)
- Yale (4709)
Filter by Type:
- Jib Cranes (5300)
- Gantry Cranes (371)
- Air Chain Hoists (269)
- Lever Hoists (229)
- Hand Chain Hoists (573)
- Integrated Trolley Hoists (270)
Gorbel® 4000 Pound (lb) Capacity Ceiling Mounted Monorails
Ceiling Mounted Monorail
**IF PRICE IS LISTED AS "QUOTE" PLEASE SELECT REQUEST A QUOTE & WE WILL PROVIDE PRICING WITHIN 24 HOURS**
Unit of Measure
Items |
/Asset/a7709.jpg GLM4000-23 Gorbel® 4 Feet (ft) Maximum Hanger Spacing (L1) and 23 Feet (ft) Runway Length Ceiling Mounted Monorail Price $3,408.60
|
/Asset/a7709.jpg GLMS4000-23 Gorbel® 20 Feet (ft) Maximum Hanger Spacing (L1) and 23 Feet (ft) Runway Length Ceiling Mounted Monorail Price $4,401.35
|
/Asset/a7709.jpg GLMSL4000-28 Gorbel® 25 Feet (ft) Maximum Hanger Spacing (L1) and 28 Feet (ft) Runway Length Ceiling Mounted Monorail Price $4,868.75
|
/Asset/a7709.jpg GLM4000-33 Gorbel® 4 Feet (ft) Maximum Hanger Spacing (L1) and 33 Feet (ft) Runway Length Ceiling Mounted Monorail Price $5,272.50
|
/Asset/a7709.jpg GLMS4000-33 Gorbel® 20 Feet (ft) Maximum Hanger Spacing (L1) and 33 Feet (ft) Runway Length Ceiling Mounted Monorail Price $6,382.10
|
|||||
Manufacturer | N/A Gorbel® | |||||||||
Brand | N/A Gorbel® | |||||||||
Support Centers | N/A GLM | N/A GLMS | N/A GLMSL | N/A GLM | N/A GLMS | |||||
Capacity | N/A 4000 lb | |||||||||
Maximum Hanger Spacing (L1) | N/A 4 ft | N/A 20 ft | N/A 25 ft | N/A 4 ft | N/A 20 ft | |||||
Runway Length | N/A 23 ft | N/A 23 ft | N/A 28 ft | N/A 33 ft | N/A 33 ft | |||||
Material | N/A Steel | |||||||||
Weight | N/A 347 lb | N/A 559 lb | N/A 829 lb | N/A 483 lb | N/A 801 lb | |||||
Product Category | N/A Ceiling Mounted Monorail | |||||||||
Note | N/A Aluminum Monorails are not available in 4000# capacity. | |||||||||
Note for List Price | N/A | |||||||||
Price Includes |
N/A
Monorails, hoist trolley, end stops, festoon gliders (festoon trolleys are provided for monorail lengths > 63’), 4 conductor #14 flat cable, festoon clamp, festoon tow arms (where applicable), festoon stack-up section, splice assemblies, and standard hanger brackets with threaded rod and hardware (up to the total number of hangers specified in the Work Station Crane Dimensional Brochure). Sway bracing (by others) is required (not included in the above prices). Center line of splice joints must be within 8” of hanger center line. |
N/A
Monorails, hoist trolley, end stops, festoon gliders (festoon trolleys are provided for monorail lengths > 63’), 4 conductor #14 flat cable, festoon clamp, festoon tow arms (where applicable), festoon stack-up section, splice assemblies, and standard hanger brackets with threaded rod and hardware (up to the total number of hangers specified in the Work Station Crane Dimensional Brochure). Sway bracing (by others) is required (not included in the above prices). Center line of splice joints must be within 48" of hanger center line. |
N/A
Monorails, hoist trolley, end stops, festoon gliders (festoon trolleys are provided for monorail lengths > 63’), 4 conductor #14 flat cable, festoon clamp, festoon tow arms (where applicable), festoon stack-up section, splice assemblies, and standard hanger brackets with threaded rod and hardware (up to the total number of hangers specified in the Work Station Crane Dimensional Brochure). Sway bracing (by others) is required (not included in the above prices). Center line of splice joints must be within 48" of hanger center line. |
N/A
Monorails, hoist trolley, end stops, festoon gliders (festoon trolleys are provided for monorail lengths > 63’), 4 conductor #14 flat cable, festoon clamp, festoon tow arms (where applicable), festoon stack-up section, splice assemblies, and standard hanger brackets with threaded rod and hardware (up to the total number of hangers specified in the Work Station Crane Dimensional Brochure). Sway bracing (by others) is required (not included in the above prices). Center line of splice joints must be within 8” of hanger center line. |
N/A
Monorails, hoist trolley, end stops, festoon gliders (festoon trolleys are provided for monorail lengths > 63’), 4 conductor #14 flat cable, festoon clamp, festoon tow arms (where applicable), festoon stack-up section, splice assemblies, and standard hanger brackets with threaded rod and hardware (up to the total number of hangers specified in the Work Station Crane Dimensional Brochure). Sway bracing (by others) is required (not included in the above prices). Center line of splice joints must be within 48" of hanger center line. |
|||||
Product Hierarchy | N/A | |||||||||
|