Product Code |
Item Name |
Runway Length |
Maximum Hanger Spacing (L1) |
Material |
Price |
---|---|---|---|---|---|
GLC250-20-23 | N/A Gorbel® 23 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 23 ft | N/A 6 ft | N/A Steel | $4,420.35 |
GLCS250-20-23 | N/A Gorbel® 23 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 23 ft | N/A 20 ft | N/A Steel | $5,115.75 |
GLCSL250-20-28 | N/A Gorbel® 28 Feet (ft) Runway Length, 25 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 28 ft | N/A 25 ft | N/A Steel | $6,497.05 |
GLC250-20-33 | N/A Gorbel® 33 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 33 ft | N/A 6 ft | N/A Steel | $5,826.35 |
GLCS250-20-33 | N/A Gorbel® 33 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 33 ft | N/A 20 ft | N/A Steel | $6,313.70 |
GLC250-20-43 | N/A Gorbel® 43 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 43 ft | N/A 6 ft | N/A Steel | $6,979.65 |
GLCS250-20-43 | N/A Gorbel® 43 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 43 ft | N/A 20 ft | N/A Steel | $7,377.70 |
GLC250-20-53 | N/A Gorbel® 53 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 53 ft | N/A 6 ft | N/A Steel | $7,938.20 |
GLCS250-20-53 | N/A Gorbel® 53 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 53 ft | N/A 20 ft | N/A Steel | $8,579.45 |
GLCSL250-20-53 | N/A Gorbel® 53 Feet (ft) Runway Length, 25 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 53 ft | N/A 25 ft | N/A Steel | $9,927.50 |
GLC250-20-63 | N/A Gorbel® 63 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 63 ft | N/A 6 ft | N/A Steel | $9,087.70 |
GLCS250-20-63 | N/A Gorbel® 63 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 63 ft | N/A 20 ft | N/A Steel | $9,456.30 |
GLCSL250-20-78 | N/A Gorbel® 78 Feet (ft) Runway Length, 25 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 78 ft | N/A 25 ft | N/A Steel | {QUOTE} |
GLC250-20-83 | N/A Gorbel® 83 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 83 ft | N/A 6 ft | N/A Steel | {QUOTE} |
GLCS250-20-83 | N/A Gorbel® 83 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 83 ft | N/A 20 ft | N/A Steel | {QUOTE} |
GLC250-20-103 | N/A Gorbel® 103 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 103 ft | N/A 6 ft | N/A Steel | {QUOTE} |
GLCS250-20-103 | N/A Gorbel® 103 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 103 ft | N/A 20 ft | N/A Steel | {QUOTE} |
GLCSL250-20-103 | N/A Gorbel® 103 Feet (ft) Runway Length, 25 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 103 ft | N/A 25 ft | N/A Steel | {QUOTE} |
AL250-20-23 | N/A Gorbel® 23 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane | N/A 23 ft | N/A 20 ft | N/A Aluminum | $6,017.30 |
AL250-20-33 | N/A Gorbel® 33 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane | N/A 33 ft | N/A 20 ft | N/A Aluminum | $7,399.55 |
AL250-20-43 | N/A Gorbel® 43 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane | N/A 43 ft | N/A 20 ft | N/A Aluminum | $8,726.70 |
AL250-20-53 | N/A Gorbel® 53 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane | N/A 53 ft | N/A 20 ft | N/A Aluminum | $10,053.85 |
AL250-20-63 | N/A Gorbel® 63 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane | N/A 63 ft | N/A 20 ft | N/A Aluminum | $11,377.20 |
AL250-20-83 | N/A Gorbel® 83 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane | N/A 83 ft | N/A 20 ft | N/A Aluminum | {QUOTE} |
AL250-20-103 | N/A Gorbel® 103 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane | N/A 103 ft | N/A 20 ft | N/A Aluminum | {QUOTE} |
GLC500-20-23 | N/A Gorbel® 23 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 23 ft | N/A 6 ft | N/A Steel | $5,323.80 |
GLCS500-20-23 | N/A Gorbel® 23 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 23 ft | N/A 20 ft | N/A Steel | $6,127.50 |
GLCSL500-20-28 | N/A Gorbel® 28 Feet (ft) Runway Length, 25 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 28 ft | N/A 25 ft | N/A Steel | $7,438.50 |
GLC500-20-33 | N/A Gorbel® 33 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 33 ft | N/A 6 ft | N/A Steel | $6,966.35 |
GLCS500-20-33 | N/A Gorbel® 33 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 33 ft | N/A 20 ft | N/A Steel | $7,526.85 |
GLCSLX500-20-34 | N/A Gorbel® 34 Feet (ft) Runway Length, 30 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 34 ft | N/A 30 ft | N/A Steel | $7,712.10 |
GLC500-20-43 | N/A Gorbel® 43 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 43 ft | N/A 6 ft | N/A Steel | $8,337.20 |
GLCS500-20-43 | N/A Gorbel® 43 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 43 ft | N/A 20 ft | N/A Steel | $8,901.50 |
GLC500-20-53 | N/A Gorbel® 53 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 53 ft | N/A 6 ft | N/A Steel | $9,459.15 |
GLCS500-20-53 | N/A Gorbel® 53 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 53 ft | N/A 20 ft | N/A Steel | $10,262.85 |
GLCSL500-20-53 | N/A Gorbel® 53 Feet (ft) Runway Length, 25 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 53 ft | N/A 25 ft | N/A Steel | $11,214.75 |
GLC500-20-63 | N/A Gorbel® 63 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 63 ft | N/A 6 ft | N/A Steel | $10,969.65 |
GLCS500-20-63 | N/A Gorbel® 63 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 63 ft | N/A 20 ft | N/A Steel | $11,501.65 |
GLCSLX500-20-64 | N/A Gorbel® 64 Feet (ft) Runway Length, 30 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 64 ft | N/A 30 ft | N/A Steel | $11,775.25 |
GLCSL500-20-78 | N/A Gorbel® 78 Feet (ft) Runway Length, 25 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 78 ft | N/A 25 ft | N/A Steel | {QUOTE} |
GLC500-20-83 | N/A Gorbel® 83 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 83 ft | N/A 6 ft | N/A Steel | {QUOTE} |
GLCS500-20-83 | N/A Gorbel® 83 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 83 ft | N/A 20 ft | N/A Steel | {QUOTE} |
GLCSLX500-20-94 | N/A Gorbel® 94 Feet (ft) Runway Length, 30 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 94 ft | N/A 30 ft | N/A Steel | {QUOTE} |
GLC500-20-103 | N/A Gorbel® 103 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 103 ft | N/A 6 ft | N/A Steel | {QUOTE} |
GLCS500-20-103 | N/A Gorbel® 103 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 103 ft | N/A 20 ft | N/A Steel | {QUOTE} |
GLCSL500-20-103 | N/A Gorbel® 103 Feet (ft) Runway Length, 25 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 103 ft | N/A 25 ft | N/A Steel | {QUOTE} |
GLCSLX500-20-124 | N/A Gorbel® 124 Feet (ft) Runway Length, 30 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane | N/A 124 ft | N/A 30 ft | N/A Steel | {QUOTE} |
AL500-20-23 | N/A Gorbel® 23 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane | N/A 23 ft | N/A 20 ft | N/A Aluminum | $7,181.05 |
AL500-20-33 | N/A Gorbel® 33 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane | N/A 33 ft | N/A 20 ft | N/A Aluminum | $8,821.70 |
AL500-20-43 | N/A Gorbel® 43 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane | N/A 43 ft | N/A 20 ft | N/A Aluminum | $10,428.15 |